Having a set budget by the client and achieving the most cost-efficient method. Four sets of stairs were not uniform as the embankment was a different height in each location. Concrete placement for stabilising rocks was a challenge as shotcrete was going to use too much concrete so we used a boom pump to place and labour for with specially made booms to push the concrete around.