Due to the high water table, the stormwater system was re-designed to allow for required volume infiltration rate. MACS were able to complete the design & procurement without affecting the construction schedule.
© MACS Australia 2022 | Privacy Policy | Terms & Conditions | Website by Perth Branding & Marketing