INDUSTRIAL
Synergy Oil Water Pit and Tie In
INDUSTRIAL
Synergy Oil Water Pit and Tie In

Excavating in an area with live under services

THE CHALLENGE


Design a Oily Water Pit with casted in pipe to allow a Knife gate valve to be install to control water to flow transformer compound to oily water system onsite.

Capabilities

Planning

Design

Construction

THE RESULTS


WHAT'S NEXT?