Installation of 3 x Refurbished Classrooms at John Curtin SHS
THE CHALLENGE
Due to the unknown site condition (based on the information supplied by client) we were required to make numerous design changes due to the natural slope of site. Craning of buildings into position with the R.L of approx. 1.8m above natural ground level.