Suez Perth Deceleration Plant Embankment
INDUSTRIAL
Suez Perth Deceleration Plant Embankment

Design and Engineer 4 lots of stairs for embankment for pedestrian use.

THE CHALLENGE


Having a set budget by the client and achieving the most cost-efficient method. 4 sets of stairs were not uniform as the embankment was a different height in each location. Concrete placement for stabilising rocks was a challenge as shotcrete was going to use to much concrete so we used a boom pump to place and labour for with specially made booms to push the concrete around.